Starting early?

In a month or so Herstmonceux will be at Railex so it’s time for me to start getting it ready. Now some of you might be thinking that it’s a bit early to start preparing for the show but Herstmonceux hasn’t been out since Exeter last July and could do with a bit of a freshen up. A few new trees need making and planting, some of the other vegetation could do with some work and the whole layout could do with a good clean.

I have also been working on some items of stock. The I3 has been on the list of needing fixing for a while. Turns out the motor mount had broken so this was fixed and some tidying up of the weathering. My Std 4mt 2-6-0 had had its motor and gearbox pinched when I built my last K Class so this has been replaced. The Birdcage set and the LBSCR Pull-Push set still needed floors adding and a spot of weathering after being used at Exeter. Something else I wanted to do was go through my wagons and sort out some of the weathering on them. A lot of my wagons had had a quick job done on them so they were usable on Herstmonceux and I thought it was about time I gave them a better going over.

There is still plenty more to be done. The D3 is getting a new motor and High Level gearbox plus a pile of new wagons need finishing off. Should be a busy month or so.

5 thoughts on “Starting early?

Leave a reply to sed30 Cancel reply